20(16) a cultural building
study for the redeveloment of a cultural centre in Jette
To adapt ageing infrastructures to the needs and ambitions of its users, the study for the Armillaire Centre consider and reorganise the qualities, functions and spaces of the existing. The position of the theatre hall and the development of an augmented circulation aim to open the building towards the public space and connect it to its neighbourhood. With many other attention points, they serve as guidelines for a potential future project.
Programme: Auditorium, conference room, ludothèque, comic book library, multi-purpose rooms, movement room, theatre residence, amphitheatre, community kitchen, music residence, administrative residence, administrative offices, computer rooms
Location : Jette, BE
Client: Administration communale de Jette
Status: completed in 2022
Surfaces: 3.000 m²
Cost: n.c
Team: A PRACTICE., architecture / ARCHITECTURES PARALLELES, conservation / SERVAIS ENGINEERING ARCHITECTURAL, stability / ENERG-IR, thermal and fluid engineering / DE FONSECA, acoustics